01.
Bob Michel Bridge Rehabilitation
Client:
Illinois Department of Transportation
Region 3/District 4
Ciorba Group, Inc.
![idot-logo-300x113.jpg](https://static.wixstatic.com/media/eafbdc_8c1aa5f2207147e8af5b84aca1ecfc46~mv2.jpg/v1/fill/w_212,h_80,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/idot-logo-300x113.jpg)
![FT5JMUDPMNAGFKJ2HDI3QTVR6Q.jpg](https://static.wixstatic.com/media/eafbdc_7f3f163e7bea4e968d27c27e38453249~mv2.jpg/v1/crop/x_940,y_397,w_980,h_287,q_80,enc_avif,quality_auto/eafbdc_7f3f163e7bea4e968d27c27e38453249~mv2.jpg)
IDOT PTB 195 ITEM 35
Bob Michel Bridge Rehabilitation
Phase I
Peoria, IL
Project Scope:
Hermann & Associates was a subconsultant to Ciorba Group, Inc. on this IDOT District 4 project. The project aimed to rehabilitate the bridge deck and improve pedestrian accommodations over the 4-lane structure. Since its completion in 1993, the structure seen significant increases in pedestrian and bicycle volumes. A major goal of the project was to improve pedestrian/bicycle access and safety to connect the cities of Peoria and East Peoria. Hermann & Associates performed alignment studies for eight unique alternatives. The preferred alignment consisted of 4 travel lanes and a barrier separated 14’ wide multi-use path on the bridge's east side. Hermann & Associates also prepared (2) Intersection Design Studies at the intersections of IL Route 40 & River Road in East Peoria and IL Route 40 & Adams Street in Peoria. Other tasks Hermann performed included preparing the Crash Analysis Report and utility coordination.
Location:
Peoria, IL
Project Elements:
Alignment Studies
Intersection Design Studies
Highway Capacity Analysis
Crash Analysis Report
Utility Coordination
![IDOT 195-35 Bob Michel Bridge_6804 web.jpg](https://static.wixstatic.com/media/eafbdc_2659c85e9185437abcd050dad7995d0f~mv2.jpg/v1/fill/w_473,h_315,q_90/eafbdc_2659c85e9185437abcd050dad7995d0f~mv2.jpg)
![IDOT 195-35 Bob Michel Bridge_6950 web.jpg](https://static.wixstatic.com/media/eafbdc_ac0f9c24e5834e1bb8e1e4403633b859~mv2.jpg/v1/fill/w_473,h_315,q_90/eafbdc_ac0f9c24e5834e1bb8e1e4403633b859~mv2.jpg)
![IDOT 195-35 Bob Michel Bridge_6954 web.jpg](https://static.wixstatic.com/media/eafbdc_87cae3918e4c4163bb820290ecdb0a96~mv2.jpg/v1/fill/w_473,h_315,q_90/eafbdc_87cae3918e4c4163bb820290ecdb0a96~mv2.jpg)