(Pioneer Parkway to Townline Road) Phase I/II Design Services
Project Scope:
University Street is a minor urban arterial that extends north from Pioneer Parkway approximately 1 mile to Townline Road in Peoria. The project consisted of a complete reconstruction of a two-lane rural roadway to a 3-lane urban roadway with all new concrete pavement, curb & gutter, storm sewer, pipe underdrains, stormwater storage chambers, concrete driveways, multi-use path, lighting, and sidewalks.
The project utilized EDA, EDP, and MFT funding and was processed through IDOT District 4 Bureau of Local Roads.
Hermann & Associates was retained by the City of Peoria to complete the Phase I/II construction plans. Hermann & Associates and a subconsultant completed the construction plans for this $5.2 million project in less than six months. In addition to meeting a challenging schedule, Hermann & Associates designed a vertical alignment that eliminated the need for right-of-way acquisition, incorporated last-minute revisions to the proposed typical section, and designed a multi-use path on one side of the road and a sidewalk on the other side all within the limited right-of-way. H&A worked with city staff to address this project's many challenges while meeting a highly accelerated schedule.
Project Elements:
Staging and Detour Plans
Phase II Construction Plans & Specifications
Quantity Computations & Cost Estimate
Environmental Survey Request
Pavement Design
Horizontal Alignment, Vertical Profile, Cross Sections
Intersection Geometrics & Grading Plans
Lighting Plans (Subconsultant)
Pavement Marking Vertical Profiles for Sidewalk and Multi-Use Path
Erosion & Sediment Control Plans
Storm Sewer Design
ADA Ramp Design
Multi-Use Path Design
Public Meetings & Coordination
Utility Coordination
Railroad Coordination
Pedestrian Island Details
Project Financials:
Funding Source: EDA, EDP, MFT
Estimated Construction Cost: $5.2 Million
![COP University Street web_adj_2.jpg](https://static.wixstatic.com/media/eafbdc_45baa547c21a4aa2b7ee61549118b795~mv2.jpg/v1/fill/w_473,h_315,q_90,enc_avif,quality_auto/eafbdc_45baa547c21a4aa2b7ee61549118b795~mv2.jpg)
![image18.jpg](https://static.wixstatic.com/media/eafbdc_764cc9a89cf64379af4183362d7df2e9~mv2.jpg/v1/fill/w_473,h_355,q_90,enc_avif,quality_auto/eafbdc_764cc9a89cf64379af4183362d7df2e9~mv2.jpg)
![image6.jpg](https://static.wixstatic.com/media/eafbdc_ac650ee5f52f4709b7d83437859d815c~mv2.jpg/v1/fill/w_473,h_355,q_90,enc_avif,quality_auto/eafbdc_ac650ee5f52f4709b7d83437859d815c~mv2.jpg)
![image15.jpg](https://static.wixstatic.com/media/eafbdc_177ba9ad64c94c1d815b289c9ec6e5ef~mv2.jpg/v1/fill/w_473,h_355,q_90,enc_avif,quality_auto/eafbdc_177ba9ad64c94c1d815b289c9ec6e5ef~mv2.jpg)