Sterling Avenue Roadway Improvements
Client:
City of West Peoria, Illinois
![West Peoria Logo.jpg](https://static.wixstatic.com/media/eafbdc_50a475eb8e9243beaa101e45f692e42a~mv2.jpg/v1/crop/x_0,y_8,w_536,h_674/fill/w_141,h_177,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/West%20Peoria%20Logo.jpg)
![DURING4 Sterling Ave 0415151012_adj.jpg](https://static.wixstatic.com/media/eafbdc_e0cbec88fcf34685946ff585fa00855c~mv2.jpg/v1/fill/w_510,h_287,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/eafbdc_e0cbec88fcf34685946ff585fa00855c~mv2.jpg)
City of West Peoria, IL Sterling Avenue Roadway Improvements
Phase I/II Design & Phase III Construction Services
Project Scope:
Sterling Avenue is a 4-lane urban arterial that extends north from IL Route 8 (Farmington Road) in West Peoria to U.S. Route 150 (War Memorial Drive) in Peoria. The project limits extended from Farmington Road to the intersection with Nebraska Avenue. The project was a complete reconstruction with all-new PCC pavement, curb & gutter, sidewalks, driveways, storm sewer, and pipe underdrains.
The project was selected by the Peoria & Pekin Urbanized Area Transportation Study (PPUATS) to receive $3.1 Million of Surface Transportation Urban Funds.
The City of West Peoria retained Hermann & Associates to complete the Phase I project development report and the Phase II construction plans. As part of the study, Hermann & Associates coordinated with IDOT on the geometrics of the intersection of Sterling Avenue and Farmington Road to improve safety and reduce the potential for crashes. Hermann & Associates also provided Phase III construction services for this project. The project was processed through the IDOT District 4 Bureau of Local Roads and was bid on a state letting.
Project Elements:
Topographical & Boundary Survey (Subconsultant)
Phase I Project Development Report
Traffic Management Plan
Phase II Construction Plans & Specifications
Quantity Computations & Cost Estimate
Environmental Survey Request
Pavement Design
Horizontal Alignment, Vertical Profile, Cross Sections
Intersection Geometrics & Grading Plans
Erosion & Sediment Control Plans
Storm Sewer Design
ADA Ramp Design
Right of Way Plats (Subconsultant)
Land Acquisition
Public Meetings & Coordination
Utility Coordination
Construction Inspection & Documentation
Materials Testing
Project Financials:
Funding Source: STU
Construction Cost: $2.1 Million
![BEFORE Sterling Ave.jpg](https://static.wixstatic.com/media/eafbdc_c4712df37bf544b4a45da45aa11f4cea~mv2.jpg/v1/fill/w_473,h_266,q_90/eafbdc_c4712df37bf544b4a45da45aa11f4cea~mv2.jpg)
![DURING1 Sterling Ave 20140729_133110_007_adj.jpg](https://static.wixstatic.com/media/eafbdc_6d46a6c989384288bd2c0d35674fb78f~mv2.jpg/v1/fill/w_473,h_266,q_90/eafbdc_6d46a6c989384288bd2c0d35674fb78f~mv2.jpg)
![DURING2 Sterling Ave 20141108_085157_797_adj.jpg](https://static.wixstatic.com/media/eafbdc_45ac200594234e508f2363615f494fb7~mv2.jpg/v1/fill/w_473,h_266,q_90/eafbdc_45ac200594234e508f2363615f494fb7~mv2.jpg)
![DURING3 Sterling Ave 0415151351a_adj.jpg](https://static.wixstatic.com/media/eafbdc_3574857f18114e67a5ce7ac1dd0bd9d1~mv2.jpg/v1/fill/w_473,h_266,q_90/eafbdc_3574857f18114e67a5ce7ac1dd0bd9d1~mv2.jpg)
![AFTER Sterling Ave 0630151027h_adj_RET.jpg](https://static.wixstatic.com/media/eafbdc_afdfc87630614bad973faa794997e64a~mv2.jpg/v1/fill/w_473,h_266,q_90/eafbdc_afdfc87630614bad973faa794997e64a~mv2.jpg)